TESTING & COMMISSIONING

All electrical system is required to be tested and commissioned before it is allowed to be in operation, In order for the system to be operational it will need to go through 3 phase of test and witness which include Factory Acceptance test ( FAT ), Site Acceptance test ( SAT ) and lastly the commissioned test, all test carry out by SJTS are in-accordance to the local code of practice and manufacturer design and standards
​
SJTS carry out its test to a wide range of electrical system which includes,
- Low Voltage ( LV ) Switchboard
- High Voltage ( HV ) Switchgear
- High Voltage ( HV ) Transformer
- Generator Switchboard
- High Voltage ( HV ) Power Cable Test
- Lightning Protection System
- Starter Motor Panel
- Switchboard Commissioning
- Transformer Commissioning